2015年8月13日星期四

80t/h granite crushing production line in Nigeria

Title: 80t/h granite crushing production line in Nigeria
Input Size: 500mm
Capacity: 100t/h
Applications: Crushing production line
Main equipment: PP900 jaw crushing plant, PP120SMHS cone crushing plant
Nowadays, Asia and Africa are rising sharply, and this political situation makes national construction in many countries have large-scale e
Materials: Granite
xpansion. As a burgeoning market in Africa, Nigeria is no exception. As we all know, the most important building material in national capital construction is aggregate. An enterprise in Nigeria noticed this business opportunity and purchased production equipment to make gravel aggregate for national construction.
This production line from Zhengzhou YIFAN Machinery is composed of PP750 mobile jaw crushing plant and PP120SMH (3S) cone crushing plant. Its production process has many procedures as follows, feeder, jaw crusher, belt conveyor, cone crusher and vibrating screen.
After procedures like jaw crusher, cone crusher and vibrating screen, the processed granite with the size of 0-5mm, 5-10mm and 10-20mm will completely satisfy the construction requirements on building stones.
At the design period, both stable performance and environmental protection are taken into consideration by our engineers. This makes our equipment have flexible operation and conform to local environmental policy in the production process.
In addition to high production efficiency, the automatic operation of our mobile crushing plant can save a lot of manpower and material resource. Moreover, the optimistic sales volume of its end products can create huge economic benefits for customers.



2015年5月26日星期二

Be careful to these when installing the mobile jaw crusher


After purchasing mobile jaw crusher,the first problem the consumers faces is installation which is a very important work. Only correct installation can the machine work normally and crate benefit for us. Or it not only delay the work progress, but also danger the safety of the works, which will make the company loss money and reputation. So the works must be cautious when installing and must do as the follows.

Configuring the power line and controlling switch according to the driving force of the mobile jaw crusher.  Please check  whether all parts bolt of the mobile jaw crusher is loose or not and whether mainframe warehouse door is fastened or not after installation.If yes, please fasten.The mobile jaw crusher should be installed in the level of concrete foundation,and fixed with anchor bolts.Pay attention to the vertical between the main body and the horizontal when installation.After checking, test the machine with empty load. If it's normal,it can be carried out.

If you are interesting in the crusher machine, welcome to insult:400-665-6688.