After purchasing mobile jaw crusher,the first problem the consumers faces is installation which is a very important work. Only correct installation can the machine work normally and crate benefit for us. Or it not only delay the work progress, but also danger the safety of the works, which will make the company loss money and reputation. So the works must be cautious when installing and must do as the follows.
Configuring the power line and controlling switch according to the driving force of the mobile jaw crusher. Please check whether all parts bolt of the mobile jaw crusher is loose or not and whether mainframe warehouse door is fastened or not after installation.If yes, please fasten.The mobile jaw crusher should be installed in the level of concrete foundation,and fixed with anchor bolts.Pay attention to the vertical between the main body and the horizontal when installation.After checking, test the machine with empty load. If it's normal,it can be carried out.
If you are interesting in the crusher machine, welcome to insult:400-665-6688.